Al Ain – UAE

Airport Air Control Tower

We have Installed all MEP Services and low current system located in the Visual Room at the top and Approach Control on lower levels.

Employer: Abu Dhabi Airports
Project Management: Masri Engineering Contracting
Indoor Area: 1,400m2
Start Finished Period: 2014-2015